Welcome to the official website of ESTL!

Current location: Home > Test > Battery test > Electrical safety tests

Output port overload
Part of the certification projects Requirements for output port overload testing

UL Certification

 Each power output pin of the output port should be overloaded as per the following regulations.    Charge the built-in battery of the battery pack to a sufficient level according to the manufacturer's specifications. Cover the battery with a layer of gauze and place it on a softwood board. Cover the softwood board with a thin sheet of paper. Then load each power output pin of the output port to draw the maximum current, for at least 1 hour. The maximum current should be slightly lower than the trip point of any protection device, which is considered to be 110% of its rated current.    Result: After completion, the gauze and paper should be intact.

CQC Certification

After the battery is fully charged according to the charging procedure specified by the manufacturer, it is charged at a constant current of 1.5 times the overcurrent protection current. The cycle test is conducted 500 times.    Result: No fire, no explosion, no leakage.

 

Online message/ Messages
logo
Service HotlineWhatsApp:+86 13925582920
Address: 2nd Floor, Block B, Jinbaisheng Industrial Park, No. 2 Zongbu Road, Songshan Lake High-tech Industrial Development Zone, Dongguan, Guangdong, China Telephone: +86 13925582920 Fax: +86-0769-85075898 Mailbox: net03@gtggroup.com
Wechat Public Number

Focus on Wechat
Public Number

WhatsApp

Email

Wechat

WeChat

WeChat QR

Scan to follow us on WeChat

TOP