Welcome to the official website of ESTL!
Follow WeChat
Current location: Home > Test > Battery test > Electrical safety tests
Service Hotline
WhatsApp:+86 13925582920Phone: +86 13925582920
Fax: +86-0769-85075898
Mailbox: net03@gtggroup.com
Address: 2nd Floor, Block B, Jinbaisheng Industrial Park, No. 2 Zongbu Road, Songshan Lake High-tech Industrial Development Zone, Dongguan, Guangdong, China
Partial certification program | External short circuit test requirements |
UN38.3 certification | Keep the test environment temperature at 57±4°C, so that the external temperature of the battery or battery sample reaches 57±4°C. |
UL certification | The positive and negative electrodes of each test battery sample were short-circuited with a Cu wire with a resistance value <0.1 Ω. The battery was discharged until it caught fire or exploded, or until the battery was completely discharged, and the temperature of the casing was again lowered to room temperature. |
CQC certification | After fully charging the battery pack, place them in an environment of 20 °C ± 5 °C and 55 °C ± 5 °C, short-circuit the positive and negative terminals of the battery pack, and the total external short-circuit resistance is 80mΩ ± 20mΩ. For the battery pack with the protection circuit removed or without the protection circuit shorted 24h, the battery pack that retains the protection circuit is short-circuited to the protection circuit. |
CB certification |
|
Focus on Wechat
Public Number
Scan to follow us on WeChat