Welcome to the official website of ESTL!

Current location: Home > News > Certification news > Technical information

UL2271 Certification Guide for E‑Scooter & PMD Battery Packs

Editor:ESTL Category:Technical information Release time:2026-02-27 Click volume:4

A best‑selling electric scooter on Amazon US was suddenly removed. The seller received a notice:“Your product is missing a compliant UL2271 battery test report.”Millions of dollars in inventory became stuck overnight. This scenario is repeated by countless cross‑border sellers.

For manufacturers and e‑commerce sellers of electric scooters, hoverboards, unicycles, and other personal mobility devices (PMDs),the UL2271 test report is NOT optional — it is a mandatory safety pass to legally enter the North American market and list on major platforms like Amazon.

This guide breaks down the full UL2271 certification process, cost, timeline, and required documents to help you break through North American market access barriers efficiently and economically.


01 Why UL2271 Is a “Must‑Have” for E‑Scooter Batteries

UL2271: Standard for Safety for Rechargeable Battery Systems for Use in Light Electric Vehiclespublished by Underwriters Laboratories (UL), applies specifically to lithium‑ion battery systems for PMDs.

It is mandatory because:

  • Official Recognition: UL is an OSHA‑recognized NRTL (Nationally Recognized Testing Laboratory).
  • Market Standard: UL2271 has become the global benchmark for light EV battery safety.
  • Platform Requirement: Amazon US requires a UL2271 test report for e‑scooter and hoverboard listings. Without it, products will be blocked or removed.

02 Critical Difference: UL2271 vs. UL2272

Many sellers confuse these two standards.

表格

Item UL2271 UL2272
Target Battery pack only Full vehicle electrical system
Scope Cells, BMS, wiring, pack structure Battery, motor, controller, charger, wiring
Relationship Required before UL2272 Requires UL2271 for the battery

Summary:If you sell battery packs, you need UL2271.If you sell complete vehicles, you need UL2272, but the battery must already pass UL2271.


03 What Tests Does UL2271 Include?

UL2271 performs comprehensive “extreme challenge” testing to verify battery safety.

Electrical Safety Tests

  • Overcharge, over‑discharge, short circuit test
  • Temperature rise test
  • Unbalanced charging test
  • Withstand voltage & insulation resistance test

Mechanical Safety Tests

  • Vibration, impact, drop (1m), crush (up to 13kN)
  • Flip/roll, housing stress, cable pull test

Environmental Safety Tests

  • Thermal cycling (−40°C to 85°C)
  • Immersion & IP waterproof test
  • Label durability test

04 How to Get UL2271 Test Report Efficiently

Process

  1. Consultation & project confirmation
  2. Submit technical documents
  3. Send test samples
  4. Full UL2271 lab testing
  5. Review draft report
  6. Correction support (if failed)
  7. Issue final test report

Sample Requirements

  • Battery packs: at least 12 units
  • Cells: at least 24 units
  • Samples must represent mass production

Required Documents

  • Application form, business license
  • Battery & cell specification
  • Circuit diagram, PCB layout, BOM
  • BMS protection logic & software description
  • Mechanical & internal structure drawings
  • Label design (UL marking, voltage, capacity, warnings)
  • FMEA report
  • User manual

05 Cost & Timeline

Cost

UL2271 test report cost depends on:

  • Battery configuration (series/parallel, voltage, capacity)
  • BMS complexity
  • Number of models in a family
  • Lab accreditation

Typical range:

  • UL Test Report (no audit): ~¥7,000 – ¥15,000
  • Full UL Certification (with audit): ~$15,000 – $20,000

Timeline

  • Documentation & sample delivery: 3–5 days
  • Lab testing: 1–2 weeks
  • Report issuance: 3–5 daysTotal: ~2–4 weeksSuggestion: Plan 2–3 months for design adjustments and retesting.

06 UL Test Report vs. UL Certification — Which Do You Need?

For most Amazon/e‑commerce sellers, a UL2271 test report is the smarter choice.

表格

Item UL Test Report UL Certification
Purpose Proof of compliance via lab test Full certification + factory follow‑up
Factory Audit Not required Mandatory initial & unannounced audits
UL Mark Not allowed Authorized to use UL mark
Cost & Time Low cost, 1–2 weeks High cost, months
Best For Amazon, e‑commerce, importers Retail, government, branded channels

Conclusion:A UL2271 test report is the most cost‑effective way to comply with Amazon and North American requirements.


07 FAQ

Q1: My cells passed UL1642. Do I still need UL2271 for the battery pack?A1: Yes.UL1642 covers cells only.UL2271 evaluates the entire battery system (cells + BMS + structure + wiring). They are not interchangeable.

Q2: My vehicle already has UL2272. Does the battery still need UL2271?A2: Yes.UL2272 requires the battery to comply with UL2271.

Q3: How long is the report valid?A3: No fixed expiration.But design, component, or process changes may require re‑testing or difference testing.

Q4: Is a factory audit required for UL2271 test report?A4: No.Audits are only required for full UL certification.

Q5: What else is needed for North America?A5:

  • Full vehicle: UL2272
  • EMC: FCC
  • Shipping: UN38.3
  • California: Prop 65 compliance

 

Contact Information (English)

Hotline: +86 13925582920Address: 2nd Floor, Area B, Jinshengsheng Industrial Park,Zongbu 2nd Road, Songshan Lake High-Tech Zone,Dongguan, Guangdong, China

Label: e‑scooter battery certification Amazon battery requirement lithium battery safety PMD battery compliance hoverboard battery UL2271 test report UL2271 UL2272
logo
Service Hotline+86 13925582920
Address: 2st floor, B Area, Jinbaisheng Industrial Park, Headquarters 2 Road, Songshan Lake Hi-tech Industrial Development Zone, Dongguan City, Guangdong Pr., China. Telephone: +86-0769-85075888 to 6617 Fax: +86-0769-85075898 Mailbox: net03@gtggroup.com
Wechat Public Number

Focus on Wechat
Public Number

Hotline

+86 13925582920
+86-0769-85075888 to 6617
+86 13925582920 7*24-hour service hotline

QQ

Wechat

二维码Focus on Wechat
TOP